EASTERN COMPANY STORES COMPLEX - EGYPT

AL-AHRAM NEWSPAPER PRESS - EGYPT

POST EVALUATION SURVEY OF ABU-ZAABAL SUBSTATION PROJECT, MARSA-MATRUH BARGE MOUNTED STEAM POWER PLANT PROJECT, AND RURAL ELECTRIFICATION PROJECT IN EL- BEHEIRA GOVERNORATE - EGYPT

SALALAH MUNICIPAL SLAUGHTER HOUSE - OMAN

SHOUBRA EL-KHEIMA POWER STATION - EGYPT

SHEMTO CO. FOOD PACKAGING COMPLEX - EGYPT

ZAFARANA WIND PARK

Project Name

EASTERN COMPANY STORES COMPLEX

Location

6th of October City - Egypt

Owner

Eastern Company

Client

Eastern Company

Project Value

$ 25 000 000

Starting/Completion

1999/ CURRENT

Scope

Planning. Design, preparation of tender documents, evaluation, construction supervision & preliminary & final acceptance.

Project Description

* The storage complex is considered a part of Eastern Company industrial complex.

* The total area allocated for stores is 220 000 m2.

* The site comprises 12 tobacco stores.

* Two models of stores have been made, small store –large store.

* The project consists of 4 small stores (first phase) – 8 large stores (second phase).

* The small store comprises a basement, a ground floor, first floor of dimensions 43 m x 190 m … The total surface area of the store buildings is 24510 m2.  The large store comprises a basement, a ground floor, first floor of dimensions 43 m x 228 m. The total surface area of the store buildings is 29412 m2.

* Customs stores department: It comprises an administrative building for customs employees, cafeteria, prayer place, dressing room, maintenance workshop that consists of a ground floor and first floor. There is a large water tank in the center of the building inside the internal playground of capacity 500 m2.

   
   

Top

Project Name

AL-AHRAM NEWSPAPER PRESS

Location

Kaliub – Egypt

Owner

Al-Ahram Organization

Client

Al-Ahram Organization

Project Value

$ 7 000 000

Starting/Completion

1984/1989

Scope

General planning, topographic surveys, soil investigations, design, preparation of tender documents for architectural, structural, sanitary, study of industrial wastes treatment and disposal, electrical and mechanical works, tender evaluation, site supervision, provisional and final acceptance

Project Description

The commercial press of Al-Ahram, located in Kaliub on Cairo/Alexandria Road over 16,500 sq. m. The total built area is approx. 22,000 sq. m. Comprising offset halls, photography, processing, etc., the press uses up-to-date technology and is considered one of the largest in the Middle East.

   
   

Top

Project Name

POST EVALUATION SURVEY OF ABU-ZAABAL SUBSTATION PROJECT, MARSA-MATRUH BARGE MOUNTED STEAM POWER PLANT PROJECT, AND RURAL ELECTRIFICATION PROJECT IN EL- BEHEIRA GOVERNORATE

Location

Egypt

 

Owner

Japan Bank for International Cooperation (JBIC)

Client

Japan Bank for International Cooperation (JBIC)

Project Value

Study

Starting/Completion

1999/2000

Scope

The Consultant is to carry out the following:

1- A brief study for each project history giving the circumstances, the criteria, and the conditions prevailing during project implementation.  

2- Design of a data collection format for each project

3- Data collection by field survey team, either during site visits to the project locations or during visits to the various authorities and governmental agencies.

4- Design of a data base to include all data recorded for each project, organized into specific fields to facilitate study and analysis of data collected.

5- Sorting, study and analysis of data collected according to preset criteria, statistical procedures will be implemented to compare data accumulated and evaluate their significance.

6- Evaluation of analysis results and presenting the required survey in a self explanatory manner.

Project Description

The Japan Bank for International Cooperation (JBIC) had employed Misr Consulting Engineers (MCE) to conduct a post evaluation survey for three major electrical projects funded by (JBIC) in Egypt.  The objective of the survey is to evaluate the effectiveness of the projects after their completion to study their impact with relation to their preset goals and forecast their outcome on the electricity sector in the near future.

   
   

Top

Project Name

SALALAH MUNICIPAL SLAUGHTER HOUSE

Location

Sultanate of Oman

 

Owner

Dhofar Municipality

Client

Dhofar Municipality

Project Value

$ 3 000 000

Starting/Completion

1994/2001

Scope

General planning, design, soil investigations, preparation of tender documents and tenders evaluation and construction supervision in addition to training of the municipal staff on all equipment.

Project Description

The project comprises a Lairage (Animal Reception), slaughterhouse building including slaughter hall for a daily capacity of 150 caws and camels and 300 sheep, clod stores and associated facilities, leather treatments, truck washing station, fertilizer station, sales outlets, generator room, cremator building and staff shelter in addition to the infrastructure facilities.

   
   

Top

Project Name

SHOUBRA EL-KHEIMA POWER STATION

Location

Shoubra El-Kheima - Egypt

 

Owner

Egyptian Electricity Authority

Client

Bechtel Consultant

Project Value

$ 30 000 000

Starting/Completion

1980/1987

Scope

Sharing in preparing the drawings, designs and tender documents for the administration and services buildings.  Duties include planning, architectural and structural studies.

Project Description

Main station for generating electricity with power of 900 Mega watts. It consists of three generating units with power of 300 Mega watts per unit and joined to the station administrative buildings, workshops and services

   
   

Top

Project Name

SHEMTO CO. FOOD PACKAGING COMPLEX

Location

Tenth of Ramadan City - Egypt

Owner

Egyptian Company for Packing and Distributing Food Stuffs

Client

Egyptian Company for Packing and Distributing Food Stuffs

Project Value

$ 30 000 000

Starting/Completion

1984/1991

Scope

 Studies for food industry, environmental pollution studies, feasibility studies and marketing, wastes disposal and reuse, studies for maintenance of production lines and administrative studies.

General planning, topographic surveys, soil investigations, preparation of complete detailed designs and tender documents for architectural, structural, sanitary, electrical and mechanical works for the buildings as well as the infrastructure facilities water and wastewater and internal roads and site supervision and management.

Project Description

Located in Tenth of Ramadan city over 100,000 sq. m. The project is a complex of 7 packaging factories and units (tea, grains, sugar, starch, flour, ready meals, fresh and frozen vegetables) in addition to training center, administration, and service buildings.

   
   

Top

Project Name

ZAFARANA WIND PARK

Location

North of Zafarana - Suez Canal Zone

Owner

Ministry of Electricity and Energy-New and Renewable Energy Authority

Client

Ministry of Electricity and Energy-New and Renewable Energy Authority

Project Value

$ 33 500 000

Starting/Completion

1997/2004

Scope

Misr Consulting Engineers in association with Decon ( Deutche Energie Consultunt ) and Electric Power Systems Engineering Company (EPS ) are responsible for the following:

1 - Site investigation, topographical survey & soil investigation

2 - Elaboration of Conceptual Design & preparation of Final Report

3 - Presentation of Final Tender Document for approval

4 - Assistance in the tender procedure & evaluation of bids and contract negotiation

5 - Preparation of the implementation plan and progress reports

6 - Witnessing and supervision of acceptance tests in the manufacturer workshops and     during commissioning

7 - Supervision during installation

8 - Control of documentation submitted by the manufacturer

9 - Supervision of maintenance work

10- Evaluation of the operation of the wind park and preparation of progress and final reports according to KfW standards

11- Supervision of final taking over

Project Description

This project comes under the support of the Government of Egypt for the installation and operation of wind parks for the environmentally sound production of electric power.

The project area is located about 10 km north of Zafarana in Suez canal zone near the coastal road Suez-Hurghada and is funded by KfW .

The project is divided into 3 phases , each phase will consist of installing a wind park with capacity of 20 - 25 MW consisting of several wind converters with individual installed capacities between 450 and 660KW each with complete infrastructure.

The project consists of the following measures :

- Installations of wind energy converters

- Transformer Stations

- O & M training

- 22 kv cable connection

- Erection of control and monitoring equipment

- Monitoring and evaluation of operation data during the warranty period

   
   